DRAFT: THESE MINUTES HAVE NOT YET BEEN FORMALLY APPROVED AT A BOARD MEETING
August 18, 2013
Board meeting
The meeting was opened at 2:05
Members Present: Richard, Sandy, Diane, Doc, Judy, Ed, LaToya, Durel, Bartlyn
Members Absent: none
1. Siding and Awnings
The siding on building 16 is finished except for doorbells. We expect that they will start building 17 this week. The new contracts contain all of the corrections from building 16 and we were able to reduce the total cost by almost $10,000. If we want a performance bond, we will have to pay for it; however, since they will be doing only one building at a time, it is really not necessary. Doc moved that we eliminate the performance bond, Richard seconded. Richard, Sandy, Doc, Judy, Ed, LaToya, Bartlyn and Durel agreed; Diane opposed.
The awning that has been put up is different from the sample LAS showed us. There was general agreement that we could probably come up with a better awning at less cost. Richard is looking into this. Doc suggested we put the matter on hold while we look into other possibilities. Diane stated that the original proposal indicated that there would be no problem with water retention. She suggested if LAS can't do this that we look into getting something similar. Doc moved and Bartlyn seconded that we table all discussion of the matter until we have more information. The motion passed unanimously.
2. Roofing
We have used all of the money from the Isaac insurance so roofing work will have to stop until we get more money. Diane suggested that we get the roofers to continue where there are patches as soon as money becomes available. Bartlyn asked how patched roofs would affect our insurance. The leaks are now caused by fireplaces. The roofers can work with the crickets and caps and LAS will take care of the sides of the fireplaces. Roofing estimates on 3, 4, and 6 and some in the 40's will run about 70,000.00.
3. Release of Funds for Siding
The paperwork requesting this was returned because of an address problem. We will request all of the money will be sent to us. These funds will go into the Insurance account. Assessment money will be kept in a separate account from operating money.
4. Attorneys
Doc indicated that there was a misunderstanding over the services of the attorney. The motion from the meeting of August 5, 2013 stated "A motion was made by Richard and seconded by Diane to accept the proposition of Butler Murdock to review the existing files. They will give two hour free per file. This motion passed unanimously. Diane and Durel were directed by the board to contact Montgomery Barnette authorizing them to transfer all the files related to CVCA to Butler Murdock."
He felt that the motion did not indicate that we would no longer be using the services of Montgomery Barnette. Butler Murdock indicated that would let us know ahead of time what they would be charging and their per-hour cost is significantly lower than that of Montgomery
Barnette. Bartlyn moved and Richard seconded that we terminate Montgomery Barnette as the legal representative for Chardonnay and that Butler Murdock provide legal services for Chardonnay Village in the future. The motion passed unanimously.
5. Finance
About $39,000 has been deposited into the assessment account. We used some of that to pay off the remainder of the bill for building 16. Some of the residents have already paid their assessments for the entire year. Diane asked if we have certificate of completion and lien wavers. Richard indicated that Doug Mayo will give those to us tomorrow. She also asked if Mr. Mayo had signed off on the completion of building 16 after the problems were redone. Durel replied that he had; that he walked with Mr. Mayo last week and he had no problems with Building. 16.
6. Rules and Regulations
Durel contacted Office Depot about the cost of printing these. If we send our own personnel there to run them off it will cost us about $200 rather than the $800 if we have Office Depot do them. We will have some ready for tomorrow for those who come to get them. We will have to mail some to those who do not live here in Chardonnay but the attorneys indicated that we do not have to send it by registered mail. Because we have no right to interfere between the owner and the tenant, we will give them out only to homeowners.
7. Trust money
The paperwork will be sent out tomorrow to take out the rest of the money that is still held in the trust fund. Doc will see that the local account number into which this money has to be transferred is available.
8. Lights
There was a whole section of lights that were out. It should be corrected now.
9. Signs
They are in process and should be ready in about two to three weeks.
10. Other
New address for ASU: 3939 N. Causeway Suite 301, 70002. They will notify all of the residents of the change of address. We will check to see if they have finished the report of the past three years.
At 3:35 Doc moved that we adjourn.